Department Menu
Inspections
NOTE: Inspection Request under construction through the online portal. Please send an inspection request to the email below.
inspections@rockdale26.soliademo.com
The primary mission of the Inspections Division is to protect the health, safety and welfare of the people by ensuring a safe building environment.
Duties and Responsibilities:
- Enforce all codes as prescribed, mandated and amended by the Georgia Department of Community Affairs.
- Enforce all rules and regulations concerning Erosion and Sediment Controls as mandated by the Georgia State Soil and Water Commission.
- Enforce all rules and regulations concerning site development as prescribed in the Rockdale County Unified Development Ordinance.
Contact Us
Telephone: 770-278-7162
Fax: 770-278-8940
email: inspections@rockdale26.soliademo.com
Mailing Address:
P.O. Box 289
Conyers, Georgia 30012
FAQs
What do I do if I need an inspection?
Email inspections to inspections@rockdale26.soliademo.com or call 770-278-7100.
How long after I request an inspection, can I expect the inspection to be performed?
Inspections will be completed within 48 hours of the request.
Can the county do something about mud in the streets?
Citizens can request a site inspection to determine the cause.
Inspection Sequence
Site Inspection: performed by the Erosion Control Specialist to insure that all required Erosion and Sediment Control measures are in place before the Land Disturbance Permit is issued (read more here).
Footing Inspection: to be made after excavations are complete and all reinforcing steel is in place; when fill dirt is used to support footings, an engineer’s report of satisfactory compaction shall be available to the inspector at the time of inspection.
In-Slab Plumbing: to be made after all plumbing is installed (before it is covered).
Concrete Slab: when all prep work is complete, the concrete slab will be inspected prior to the placement of concrete.
Combination Rough Inspections: includes framing, plumbing, mechanical and electrical performed prior to the insulation.
Final Electric: to be made after the electrical panel is complete and the building is secure.
Swimming Pool Inspections
Bonding Inspection: to be made prior to the pool deck being installed to insure that all metal parts are bonded.
Final Pool: to be made after the pool is 100% complete and any required fencing is installed.
Planning & Development
Rockdale County Planning & Development
1117 West Avenue SW,
Conyers, GA 30012
Phone: (770) 278-7100
Office Hours: 8 a.m. to 5 p.m.
Monday through Friday
Code Enforcement
Rockdale County Code Enforcement
2570 Old Covington Highway
Conyers, GA 30012 (map)
Phone: 770-278-7103
Contact Us
Business Licenses
businesslicense@rockdale26.soliademo.com
Planning & Zoning
planningandzoning@rockdale26.soliademo.com
Code Enforcement
code.violationsmailbox@rockdale26.soliademo.com
Building Permits & Inspections
inspections@rockdale26.soliademo.com









